The Specialist Mining Simulation & Optimisation Software

Transforms your static mine design and makes it intelligent and dynamic. It is not only for mine development – it is designed for complete end-to-end mining operations.
simmine layout
simmine underground mining mini

Make Your Mine Intelligent & Dynamic

Optimise your production and development fleet requirements and scheduling of underground development, and make sure your development project is completed on time and within budget.

Designed for anyone involved in mine design and planning, operations, and management, SimMine is a unique mine simulator that can directly import your mine layout to evaluate development rates and production plans.

Development

Orebody
Access

Mine Production

Stoping, Caving
Operations

Equipment Optimisation

LHDs, Trucks, Conveyors, Bins/Silos, Crushers

Visualise your mine with powerful 3D animations that are already coded in the software, displaying mine development sequences, equipment fleet movement and dynamic mining progress.

Benefits

Optimise costs and schedules

Analyse projects costs and resources schedules and optimise the equipment maintenance schedule

Test Alternative Scenarios

Test alternative scenarios to optimise development plan and maximise rates (e.g. additional trackless equipment, operators, alternative shifts, etc.)

Capture the effect of variation

Dynamic simulation is the only tool that can capture the effect of variation (e.g. activity times), equipment interference and queuing and randomness

Find optimal capacity requirements & schedules

Find the optimal equipment fleet size and procurement schedule, ore handling system capacity and shift schedule

Features

Case Studies

Portal to Steady State - Effectively evaluating project goals using SimMine® mining simulation software

The model was developed to accurately establish achievable development rates, production rates, optimal development sequence, and fleet size required to ensure that the LHOS project targets are met.

Mine access development simulation through direct mine design data integration

The objective of this case study is to compare various access development options and technology trade-offs for developing the underground infrastructure from the mine portals to the start of the production development sections.

SimMine vs Generic Simulation Software

All modules come with basic functionality to setup a layout and vehicles to perform different activities in the mine. Add modules to enhance your user experience.

Feature Generic Simulation Software SimMine
Programming of several logical steps, including cycles and equipment movement
Complex
Simple
Setup of Layout, Nodes / Stations, loading / dumping logic, dispatch logic
Complex
Simple
Dynamic Opening of new staging / transfer points / conveyors
Time Consuming
Quick
Speed Restrictions in various parts of a mine
Time Consuming
Quick
Standard outputs e.g. Advance / day, Periodic Tonnages, Equipment Utilisations etc.)
Time Consuming
Quick
Operating and Blasting Schedules, interruption of activities
Time Consuming
Quick
Dynamic Face Advance, especially animation thereof
Complex
Simple
Interdependencies of Sections
Complex
Simple
Rock Types (Ore / Waste)
Complex
Simple
Dynamic Face Profiles (Dimensions)
Complex
Simple
Different Equipment and Development Cycle for different sections of a mine
Complex
Simple
Verification and Validation
Time Consuming
Quick

Find Out More

Fill in your details here and we’ll arrange a meeting and demonstation on the uses of SimMine.

    content bg 2